GuideFor engineering and A&E firms

How to answer a construction RFI with AI.

To answer a construction RFI with AI, give the AI the question, the drawings and specs it names, and a few past replies. The AI writes a first draft. Your engineer checks it, makes every decision and sends it. The AI does not make design decisions. Your engineers do. An RFI is a request for information: a written question about the drawings, specs or contract.

01 / What an RFI is

What is an RFI in construction?

An RFI in construction is a written question about the drawings, specs or contract, sent during the build. Specs are the written rules for the materials and the work. The contractor often sends the RFI, and the architect or engineer answers in writing.

AIA, the American Institute of Architects, has a standard RFI form called G716. AIA says an RFI is for facts the sender cannot find by research, by reading the documents, or in other reasonable ways.

On the AIA form, neither the RFI nor the reply approves extra cost or time. The City of Los Angeles project delivery manual adds that an RFI should not change the design. If the design must change, a change order follows. A change order is a written change to the work, price or time in the contract.

02 / What a reply holds

What should a good RFI reply include?

A good RFI reply answers the exact question, names the sheets it relies on, and says if cost or time may change.

Part of the replyWhat it says
RFI numberThe number from your RFI log, the list of every RFI on the project.
The answerA short, clear answer. If it is already in the documents, name the sheet.
ReferencesThe sheets, details and spec sections it relies on, plus a sketch if words are not enough.
Cost and timeWhether the answer may change cost or time. The reply itself does not approve that change.
Design changeIf the design must change, a note that a change order will follow.
Reviewed byThe engineer who checked and sent it, and the date.

You can use these rows as an RFI response template. AIA’s instructions also ask for a short answer and any known effect on cost or schedule.

03 / Where AI helps

Where does AI help, and where does the engineer decide?

The AI drafts the reply from your files, and your engineer decides the answer.

TaskThe AIYour engineer
Read the RFILists the sheets and spec sections it namesChecks that nothing is missing
Find past repliesFinds replies on the same detail in the files you give itDecides if they still apply
Write the replyWrites a first draft in your firm’s styleFixes and approves it
Make the design callDoes not decideDecides
Cost and timeMarks where the answer may change cost or timeDecides and tells the project manager

The AI does not make design decisions. Your engineers do.

Your firm decides how this fits your own professional duties. Ask your own counsel.

04 / RFI or submittal

What is the difference between an RFI and a submittal?

An RFI asks a question, and a submittal shows what the contractor plans to use so the engineer can check it.

A submittal is a package the contractor sends for review, like shop drawings, data sheets or samples. The Los Angeles manual calls a shop drawing the contractor’s plan for the products, materials and equipment it will install.

QuestionRFISubmittal
What is it for?To get missing facts, or a way forward when two documents disagreeTo check that the items meet the contract
When is it sent?When a question comes up during the buildBefore the item is made, put in or used

The Los Angeles manual also says an RFI should not take the place of a shop drawing submittal.

05 / A made-up example

Here is a made-up RFI and the AI’s first draft.

This example is made up. It shows a first draft and what the engineer changes.

The RFI (made up)

RFI 014, from the general contractor, on a made-up office building. The supply duct on sheet M-201 crosses beam B7. Sheet S-201 shows no opening in the beam. Can we run the duct below the beam, or will you add an opening?

The AI’s first draft (made up)

Reply to RFI 014. Sheets checked: M-201, S-201 and A-501.

Answer: [Engineer to choose: run the duct below beam B7, or add an opening in the beam.]

If below: keep the ceiling height on A-501. If an opening: do not cut the beam until we send a detail.

Cost and time: [Engineer to confirm.] This reply does not approve extra cost or time.

Related: RFI 006, about a duct at grid line 5.

What the engineer changed (made up)

The engineer chose the route below the beam and deleted the other option. RFI 006 was about a different duct, so she cut that line. Then she sent the reply and logged it.

06 / How to start

How can your firm start with one RFI workflow?

Start with one workflow in the AI your firm already pays for: Claude, ChatGPT or Microsoft Copilot.

A workflow is one task your team does again and again, done the same way with AI. It has three parts: the AI piece, a template for the result, and one page of AI use rules.

  1. 01

    Pick three good past replies.

    • They show the AI your firm’s style.
  2. 02

    Write the template and the rules.

  3. 03

    Test it on ten real RFIs.

    • Run them only inside your firm’s own AI account.
    • Compare each draft with the reply your engineer would send.
  4. 04

    Keep the engineer in charge.

    • Your engineers review every reply before it goes out.

07 / How Ego Eimi helps

Ego Eimi can build this workflow for your firm.

Ego Eimi builds software and AI systems for established businesses. This offer is for engineering-led A&E firms with 20 to 200 staff. If your team writes RFI replies by hand, this is a good first task.

  • ✓We build on test data. Your client data stays with your firm. Your firm owns what we build for it: the workflow, its template and the AI use rules.
  • ✓We will not ask you to buy new software for the first step.
  • ✓You see the first result on day 7. The workflow is live in 30 days.
  • ✓About 2 hours of your team’s time in the first week.
  • ✓Projects start at USD 10,000, at a fixed price.

08 / Common questions

Can AI answer construction RFIs?

AI can write a first draft from the drawings, specs and past replies your team gives it. Your engineer makes the design decision, checks the draft and sends it.

What is an RFI log?

An RFI log is the list of every RFI on a project, with its number, dates, who must answer and its status. AIA says RFIs should be numbered, logged and tracked.

How long do we have to answer an RFI?

Check your contract. On the AIA form, the sender writes the date they need the answer. AIA says that date should follow the contract, or what is reasonable.

Will Ego Eimi see our project files?

We build on test data. On day 1, you show us three past examples, with names and private details taken out. Your client data stays with your firm. Your staff use the AI under your firm’s own agreement with your AI provider.

Last updated November 20, 2026.