How to answer a construction RFI with AI.
To answer a construction RFI with AI, give the AI the question, the drawings and specs it names, and a few past replies. The AI writes a first draft. Your engineer checks it, makes every decision and sends it. The AI does not make design decisions. Your engineers do. An RFI is a request for information: a written question about the drawings, specs or contract.
01 / What an RFI is
What is an RFI in construction?
An RFI in construction is a written question about the drawings, specs or contract, sent during the build. Specs are the written rules for the materials and the work. The contractor often sends the RFI, and the architect or engineer answers in writing.
AIA, the American Institute of Architects, has a standard RFI form called G716. AIA says an RFI is for facts the sender cannot find by research, by reading the documents, or in other reasonable ways.
On the AIA form, neither the RFI nor the reply approves extra cost or time. The City of Los Angeles project delivery manual adds that an RFI should not change the design. If the design must change, a change order follows. A change order is a written change to the work, price or time in the contract.
02 / What a reply holds
What should a good RFI reply include?
A good RFI reply answers the exact question, names the sheets it relies on, and says if cost or time may change.
| Part of the reply | What it says |
|---|---|
| RFI number | The number from your RFI log, the list of every RFI on the project. |
| The answer | A short, clear answer. If it is already in the documents, name the sheet. |
| References | The sheets, details and spec sections it relies on, plus a sketch if words are not enough. |
| Cost and time | Whether the answer may change cost or time. The reply itself does not approve that change. |
| Design change | If the design must change, a note that a change order will follow. |
| Reviewed by | The engineer who checked and sent it, and the date. |
You can use these rows as an RFI response template. AIA’s instructions also ask for a short answer and any known effect on cost or schedule.
03 / Where AI helps
Where does AI help, and where does the engineer decide?
The AI drafts the reply from your files, and your engineer decides the answer.
| Task | The AI | Your engineer |
|---|---|---|
| Read the RFI | Lists the sheets and spec sections it names | Checks that nothing is missing |
| Find past replies | Finds replies on the same detail in the files you give it | Decides if they still apply |
| Write the reply | Writes a first draft in your firm’s style | Fixes and approves it |
| Make the design call | Does not decide | Decides |
| Cost and time | Marks where the answer may change cost or time | Decides and tells the project manager |
The AI does not make design decisions. Your engineers do.
Your firm decides how this fits your own professional duties. Ask your own counsel.
04 / RFI or submittal
What is the difference between an RFI and a submittal?
An RFI asks a question, and a submittal shows what the contractor plans to use so the engineer can check it.
A submittal is a package the contractor sends for review, like shop drawings, data sheets or samples. The Los Angeles manual calls a shop drawing the contractor’s plan for the products, materials and equipment it will install.
| Question | RFI | Submittal |
|---|---|---|
| What is it for? | To get missing facts, or a way forward when two documents disagree | To check that the items meet the contract |
| When is it sent? | When a question comes up during the build | Before the item is made, put in or used |
The Los Angeles manual also says an RFI should not take the place of a shop drawing submittal.
05 / A made-up example
Here is a made-up RFI and the AI’s first draft.
This example is made up. It shows a first draft and what the engineer changes.
The RFI (made up)
RFI 014, from the general contractor, on a made-up office building. The supply duct on sheet M-201 crosses beam B7. Sheet S-201 shows no opening in the beam. Can we run the duct below the beam, or will you add an opening?
The AI’s first draft (made up)
Reply to RFI 014. Sheets checked: M-201, S-201 and A-501.
Answer: [Engineer to choose: run the duct below beam B7, or add an opening in the beam.]
If below: keep the ceiling height on A-501. If an opening: do not cut the beam until we send a detail.
Cost and time: [Engineer to confirm.] This reply does not approve extra cost or time.
Related: RFI 006, about a duct at grid line 5.
What the engineer changed (made up)
The engineer chose the route below the beam and deleted the other option. RFI 006 was about a different duct, so she cut that line. Then she sent the reply and logged it.
06 / How to start
How can your firm start with one RFI workflow?
Start with one workflow in the AI your firm already pays for: Claude, ChatGPT or Microsoft Copilot.
A workflow is one task your team does again and again, done the same way with AI. It has three parts: the AI piece, a template for the result, and one page of AI use rules.
- 01
Pick three good past replies.
- They show the AI your firm’s style.
- 02
Write the template and the rules.
- Start from the rows in the table above.
- Say what staff may put into the AI, and who reviews each draft. See what our AI use rules cover.
- 03
Test it on ten real RFIs.
- Run them only inside your firm’s own AI account.
- Compare each draft with the reply your engineer would send.
- 04
Keep the engineer in charge.
- Your engineers review every reply before it goes out.
07 / How Ego Eimi helps
Ego Eimi can build this workflow for your firm.
Ego Eimi builds software and AI systems for established businesses. This offer is for engineering-led A&E firms with 20 to 200 staff. If your team writes RFI replies by hand, this is a good first task.
- ✓We build on test data. Your client data stays with your firm. Your firm owns what we build for it: the workflow, its template and the AI use rules.
- ✓We will not ask you to buy new software for the first step.
- ✓You see the first result on day 7. The workflow is live in 30 days.
- ✓About 2 hours of your team’s time in the first week.
- ✓Projects start at USD 10,000, at a fixed price.
08 / Common questions
Can AI answer construction RFIs?
AI can write a first draft from the drawings, specs and past replies your team gives it. Your engineer makes the design decision, checks the draft and sends it.
What is an RFI log?
An RFI log is the list of every RFI on a project, with its number, dates, who must answer and its status. AIA says RFIs should be numbered, logged and tracked.
How long do we have to answer an RFI?
Check your contract. On the AIA form, the sender writes the date they need the answer. AIA says that date should follow the contract, or what is reasonable.
Will Ego Eimi see our project files?
We build on test data. On day 1, you show us three past examples, with names and private details taken out. Your client data stays with your firm. Your staff use the AI under your firm’s own agreement with your AI provider.
09 / Sources
- AIA Contract Documents help center: Summary of G716-2004, Request for Information (RFI) · checked November 20, 2026
- AIA Contract Documents help center: Instructions for G716-2004, Request for Information (RFI) · checked November 20, 2026
- City of Los Angeles Bureau of Engineering, Project Delivery Manual: 16.2 Request for Information (revised 2018-05-15) · checked November 20, 2026
- City of Los Angeles Bureau of Engineering, Project Delivery Manual: 16.1 Shop Drawings (revised 2018-05-15) · checked November 20, 2026
Last updated November 20, 2026.
Next / Your first call
Free · 30 minutes
Start with one task. See the result on day 7.
Before the call, we send you a one-page estimate about your firm. On the call, we update it with your real numbers.